Our primary items are Needle Roller bearings, Cylindrical Roller Bearings, Rod finish Bearings, Spherical simple bearings, Track roller Bearings for Guideway, Roller Bearings, Mix Bearings for forklifts, H2o Pump Bearings, SNR Vehicle Bearings and all types of Spherical Bearings. If you want any information or samples, make sure you speak to us and you will have our soon reply. makes certain the stability and consistency of the essential purpose of elements. Our organization will offer you you the large quality items with a lower price comma quick delivery commaand specialist soon after-sale services time period
EPTT EPTT 55t Tough Terrain Crane for EPTT lparRT55E rpar
Primary specialized info in travel configuration
Group | Product | Parameter | Allowance | ||
Dimension |
Total size | mm | 12032 | pm1 percnt | |
Overall width | mm | 2980 | -one percnt~ | ||
Overall top | mm | 3530 | -1 percnt~ | ||
Wheel foundation | mm | 3741 | pm1 percnt | ||
lpar sol rpar Track lparfront solrear rpar | mm | 2330 | pm1 percnt | ||
sol Front solrear overhang | mm | 1966 sol2240 | pm1 percnt | ||
sol Front solrear extension | mm | 4085 sol0 | pm1 percnt | ||
Weight | Complete mass in vacation configuration | kg | 38500 | pm3 percnt | |
Axle load | 1st Axle | kg | 18670 | pm3 percnt | |
2nd Axle | kg | 19830 | pm3 percnt | ||
Travel |
Max period of time journey speed | km solh | 35 | geq | |
Min time period turning radius | m | five period7 lpar rpar comma9 period2 lpar rpar five period7 lpar4 wheels rpar comma 9 period2 lpar2 wheels rpar |
pm3 percnt | ||
Min period of time floor clearance | mm | 460 | pm1 percnt | ||
Method angle | deg | 25 period8 | pm1 deg | ||
Departure angle | deg | 21 period8 | pm1 deg | ||
lpar 24km solh rpar Braking length lparat 24 km solh rpar |
m | nine | le | ||
Max period of time grade-capacity | percnt | 55 | geq | ||
EPTT |
Engine model | QSB6 period7 | sol | ||
Rated engine EPTT | kW | 149 | sol | ||
Engine rated rotation pace | r solmin | 2100 | sol | ||
Motor emission stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd | sol | Off-road comma U Intervals periodEPTA Tier three solEU Stage IIIA | sol | ||
Driving kind | sol | 4 times2 comma four times4 | sol | ||
Tire specifications | sol | 23 period5R25 | sol | ||
Number of tires | sol | 4 | sol |
Classification | Merchandise | Parameter | Allowance | |||
Main performance |
Max time period rated lifting capacity | t | 55 | pm5 percnt | ||
Min period of time rated doing work radius | m | two period5 | pm1 percnt | |||
lpar rpar EPTT radius at turntable tail lparat counterweight rpar |
mm | 4090 | pm1 percnt | |||
Max interval load moment | Base boom | kN middotm | 1690 | pm5 percnt | ||
Totally-prolonged boom | kN middotm | 1571 | pm5 percnt | |||
Outrigger span | EPTTitudinal | m | 7 period0 | pm1 percnt | ||
lpar sol rpar Lateral lparfully solhalf extended rpar |
m | seven period0 sol5 period6 | pm1 percnt | |||
EPTT top |
Base increase | m | nine period9 | pm1 percnt | ||
Totally-extended boom | m | 37 period9 | pm1 percnt | |||
in addition Fully-extended growth in addition Jib |
m | fifty three | pm1 percnt | |||
EPTT size |
Base increase | m | ten period3 | pm1 percnt | ||
Fully-extended boom | m | 38 period2 | pm1 percnt | |||
plus Fully-prolonged boom additionally Jib |
m | 55 period2 | pm1 percnt | |||
Jib offset angle | deg | deg comma20 deg comma4 deg |
pm1 deg | |||
Operating pace |
Time for increase elevating | s | 70 | le | ||
Time for boom extending completely | s | 140 | le | |||
Max interval slewing velocity | r solmin | 2 period0 | geq | |||
Outrigger extending sol retracting time |
Outrigger beam | EPTTltaneousl y extending | s | forty | le | |
EPTTltaneousl y retracting | s | thirty | le | |||
Outrigger jack |
EPTTltaneousl y extending | s | 55 | le | ||
EPTTltaneousl y retracting | s | forty | le | |||
lpar rpar EPTTing velocity lparat 4th layer comma no load rpar | Major winch | m solmin | a hundred thirty | geq | ||
AuXiHu (West Lake) Dis.liary winch | m solmin | 130 | geq |
Firm profile
EPTT is a building EPTTry manufacturer with in excess of 70 several years of encounter time period Over the many years comma we have grown to turn into the world aposs most complete design EPTTry company and influential multinational firm period In 2015 comma we rank No period1 in EPTT and No interval five in EPTT weighty products market periodEPTT aposs design EPTTry handles an astonishing variety of tools comma incXiHu (West Lake) Dis.Hu (West Lake) Dis. cranes comma earth-transferring EPTTry comma street EPTTry comma excavators comma concrete EPTTry comma mining EPTTry comma piling EPTTry comma lumber EPTTry comma EPTT-combating EPTTry comma hefty EPTTs comma sanitation EPTTry comma agricultural EPTTry comma and more time period We have the entire world aposs most extensive item line comma and offer you consumers total answers for construction products period Our other firms incEPTT finance comma leasing comma and remanufacturing period
At present comma the EPTT of my company aposs straight-arm crane is totally from the EPTT oil strain comma that is comma through the higher-pressure EPTT oil to encourage the cylinEPTTpiston reciprocating motion comma or EPTT the EPTT motor rotation makes the EPTT winch and rotary system rotation period
So comma how do higher-pressure EPTT oil get quest Every EPTT crane is outfitted with a EPTT pump when the vehicle chassis is matched comma and the engine provides EPTT for it period The chemical vitality of the gas can be converted into the crankshaft of the engine to rotate the mechanical strength comma and then the EPTT EPTT is rotated comma and then the EPTT is transmitted to the EPTT pump by way of the EPTT EPTT of the EPTT period As a result comma the EPTT pump can repeatedly pressurize the EPTT oil For the large-force EPTT oil comma so as to supply EPTT for the crane to obtain the lifting of the items time period
Competitive Benefit
My organization aposs straigEPTT arm crane crane addresses 1-twenty five tons fourteen designs sixty five kinds of items comma to meet a selection of situations comma with the EPTTest arm of the premier tonnage crane mature manufacturing EPTT comma EPTT study and deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment approach comma EPTT EPTT and deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment EPTT comma and continuously have new goods to marketplace comma to satisfy customer use time period
My organization aposs boom arm EPTT with experienced pentagonal comma hexagonal and octagonal comma the most recent technology of products with U-shaped arc arm entire body weigEPTT reduction comma arm width of a huge deflection comma steadiness and resistance to deformation Capacity to improve comma considerably boost the lifting potential period
The software of the sub-arm comma sub-winch and vice-hook provides a basis for the quick and large-scale procedure of the crane ligEPTT load and the large-altitude procedure period The software of computerized hook EPTT will save time and effort when starting up and ending crane functions comma generating it straightforward to run very easily period
Get in touch with us
Mr EPTT plus86 187 9621 1467
Mr Ding plus86 138 5200 7271
Mr zou plus86 152 6202 3988 Business profile