we have attained the believe in of customers globally. We can provide a full-range of electricity transmission items like chains, sprockets and plate wheels, pulleys, gearboxes, motors, couplings, gears and racks. Having amassed cherished encounter in cooperating with international buyers,
EPTT Official Qy50ka 50 Ton EPTT Cellular EPTT Crane
EPTT QY50KA EPTT crane’s framework is compact, the market operating performance is the highest. EPTT overall performance and driving functionality of a thorough up grade, foremost opponents. Dual-pump confluence EPTT, running effectiveness of a complete direct.
one. EPTTing lifting and driving performances
Five EPTT U-type booms. The boom size is 11.4m-43.5m with strong lifting performance, foremost five%-10% ahead of products with the very same tonnages in the identical market.
Higher-EPTT motor with very good dynamic performance, strong gradeability and excellent trafficability. The maXiHu (West Lake) Dis.mum gradeability and maXiHu (West Lake) Dis.mum travel velocity respectively are 42% and 85km/h.
two. Reliability of heat dissipation, EPTT method and so on. has been enhanced with safer operation and driving
Water-resistant connector clip is geared up with rubber sheath within with outstanding drinking water impervious and degree of protection reaches to IP65.
The air-conditioning condenser is separately put in, the warmth-sinking functionality is sharply improved and the surroundings temperature arrived at to a lot more than forty five ordmC.
3. Mature and reliable double-pump confluence strategy, mainXiHu (West Lake) Dis.Hu (West Lake) Dis. the positive aspects of effective procedure
The double-pump confluence strategy is adopted in elevating and slipping of winch, extending and retracting of lazy increase and luffing, leading ahead of luffing and extending and retracting operations.
four. Air-support change EPTTs and 45% of shifting drive is diminished
The increase system will work only by stepping on the clutch that effectively avoids EPTT damaging EPTTs when shifting. In comparison with the same industry, 100mm distance of change EPTTs and forty five% of shifting drive are respectively lowered.
[Solution Parameter]
Description | Unit | Parameter benefit | |
Overall length | mm | 13930 | |
Overall width | mm | 2780 | |
Overall Height | mm | 3630 | |
Axle base | 1st ,2nd axle | mm | 1470 |
2nd ,3rd axle | 4300 | ||
third ,4th axle | 1350 | ||
Wheel Foundation | mm | 2304 2075 | |
Entrance overhang/rear overhang | mm | 2389/2064or 2376/2064 | |
Front extension/rear extension | mm | 2131/226 or 2144/226 | |
Overall vehicle mass in travel configuration | kg | 42200 | |
Axle load | Entrance axle | kg | 16200 |
Rear axle | 26000 | ||
Motor Model | WD615.338 | ||
Engine rated EPTT | kw/(r/min) | 276/2200 | |
Motor rated torque | N.m/(r/min) | 1500/1300-1600 | |
Max. travel velocity | km/h | 85 | |
Min. regular vacation velocity | km/h | 2~three | |
Min. turning diameter | m | 24 | |
Min. ground clearance | mm | 327 | |
Max. quality capacity | % | forty two | |
Strategy angle | deg | 19 | |
Departure angle | deg | 15 | |
Braking length (at 30 km/h, complete load ) | m | le10 | |
Oil consumption for every 100km | L | 40 | |
Exterior sound amount during acceleration traveling | dB (A) | le88 | |
Sounds degree at seated placement | dB (A) | le90 |
[Solution Picture]
[Organization Data]
[FAQ]
1: What variety phrases of payment can be acknowledged?
A: For conditions of payment, L/C, T/T, D/A, D/P, Western EPT (can be) could acknowledged.
2: What certificates are accessible in EPTTry?
A: For the certificate, we have CE, ISO, Gost, EPTA(United states)CCC.
3: What about the shipping and delivery time?
A: seven-thirty daEPTTafter acquiring the deposit.
four: What about the warranty time?
A: 12 months right after shipment or 2000 doing work hours, whichever occuts 1st.
5. What about the Bare minimum OrEPTTEPTTtity?
A: The MOQ is 1 pcs.