Advanced thermo treatment method gear, this kind of as network heat treatment oven, multi-use thermo treatment method oven, etc. Our items are used in many fields. With comprehensive requirments, we can also create your particular created item.
Accept Customization
Product description of PPGI EPT EPT Steel Roof Sheet Stamping Forming EPT
This Cold steel roofing panel roll forming EPT is created by our pros uEPTzing high quality element. Metal variety Roofing Panel has a gorgeous visual appeal and brigEPT colour. It is broadly utilized in XiHu (West Lake) Dis.Hu (West Lake) Dis.den, manufacturing facility, vacation resort, lodge, EPT hall, vacationland,XiHu (West Lake) Dis.Hu (West Lake) Dis.ent architectures and contemporary villa.
EPT is tailored.
Comparable EPT perhaps u like:
Operating procedure
The comprehensive line incEPTs decoiler, forming EPT, computer managing technique and run out tables. Our EPTs are equipped with a personal computer controlling technique to maintain products exact.
Major parameter
NO |
Sort |
Specification | |
one |
Uncooked materials | Sort | PPGI |
Thickness | .three-.8 mm or as customer’s request | ||
2 |
Decoiler | Procedure | Handbook |
WeigEPT apacity | 5 Tons | ||
3 |
Main body | Roller station | 23 row |
Diameter of shaft | 75 mm | ||
Shaft substance | forty five# with .05mm chrome | ||
Roller material | 45# with .05mm chrome | ||
Kind | EPT variety | ||
Body | 300mm C-beam | ||
Body thickness | 16 mm | ||
EPT | Cr twelve | ||
Procedure | EPT automatic | ||
Operating velocity | 10-thirty m/min | ||
4 |
EPT | Driving way | one inch EPT |
Primary motor | five.five KW | ||
Voltage | 380V/50HZ, 3 stage | ||
five |
Management box | Electric box | PLC control program, invEPTr |
PLC manufacturer | Delta produced in EPTiwan | ||
Inverter brand | Delta manufactured in EPTiwan | ||
Language | EPT and EPT |
Handbook decoiler
It is passive type could load coil by expend the blots correct at coil internal diameter. It is straightforward to operate and inexpensive solution.
XiHu (West Lake) Dis.hu (West Lake) Dis. unit
Adopt XiHu (West Lake) Dis.Hu (West Lake) Dis. bar and sliding block to manage the width and placement of the steel sheet. The coil is XiHu (West Lake) Dis.Hu (West Lake) Dis.d in the appropriate place and passed to the roll forming technique. Can adjust the XiHu (West Lake) Dis.Hu (West Lake) Dis. bar with loosing the fiXiHu (West Lake) Dis.ng bolts to feed sheet in rigEPT place. It is set framework to make certain can not go easily.
Roll Forming System:
Roll forming system consist of EPT frame, EPT program, EPT motor and roll forming system.
A. EPT body adopts welding composition with shot blasting and painting treatment
B. All rollers materials adopt substantial high quality No. 45 steel, with challenging chrome coated on surface area, all therapy by complete CNC EPTs, to make sure the rollers with very good rigidity and precision, and sort best roofing sheet as for each design and style.
C. All rolling shafts are made by higher quality No. forty five steel with quench and mood therapy, so the shafts with great rigidity which could use for EPT tern with out deformation.
D. Rolling shafting supporting framework variety is steel wall and welded with the basement with each other to have rigidity.
E. Cycloidal pin EPT speed EPT motor EPTn, the again/EPT roller EPTn by EPT, component of upper/decrease rollers EPTn by EPT
F. Modify the screw bar manually to alter the length between higher/reduced rollers for variation thickness of sheet.
(Consideration: all rolling technique has adjusted in our company as a perfect predicament, we do not propose to modify the rollers at random, if necessary, should modify by a experienced technician or right after practice by our engineer. Otherwise will result in the EPT can not type a great profile
Reducing gadget
A. Adopts submit cutting, the cutting blade materials is Cr12 with quenched therapy, after slicing, there is no content squandered.
B. Adopts welded body for very good rigidity.
C. The cutting motion is droved by the EPT from EPT station which assures the procession of the chopping and minimal noisy, EPT life.
EPT Method
It is controlled by EPT wheel oil pump. Soon after filling the EPT oil into the EPT oil tank, the pumps EPT the cutter EPT to start the chopping task.
The system incEPTs a established of EPT tank, a established of EPT oil pump, two EPT pipes. And two sets of electromagnetism valves.
EPT of the oil pump: 3kw
EPT oil: forty#
PLC management system
It adopts EPT pc to control. The focus on piece’s duration is adjustable and digit of it can be altered. Computed manner has two modes: automatic and manual 1. The technique is straightforward to function and use.
Processing precision: inside one.00mm
It contains liquid crystal EPT, programmer, transformer for the electronic EPTs and kits of every single part. Touch EPT
PLC is EPTiwan Panasonic
Transducer brand name is EPTiwan Delta
The vendor need to offer EPT and EPT language EPT
Counter
One particular counter gauges size, pulses, and decides size.
Work actions
To check EPT video or much more particulars, contact with me
We EPT sell to plenty of nations around the world
Our certification
Firm information
EPT team is a professional producer designing and making roll forming EPTs estabEPTd in June 1996. We have 4 factories doing work in BeiEPTg, TianEPT and ZheJiang province. Much more than four hundred workers provide provider for u.
EPT primarily incEPT trapezoidal steel roof/wall panel EPT, C ampZ form purline EPT, highway guardrail EPT, sandwich panel manufacturing line, deck forming EPT, C U L ligEPT keel EPT, shutter slat doorway forming EPT, reducing EPT, downpipe EPT, gutter EPT, and many others.
How to go to us?
Our service
1. Free technological support and free accessories supply.
two. Engineer available to services EPTry overEPT.
3. 1 calendar year warranty is presented.
4. EPT existence specialized guidance for cost-free.
five. We alwaEPToffer specialized help, swift reaction, all your inquire will be replied in 24 hrs.
Question amp Response
one. Q: How to pay a visit to our business:
A: Fly to BeiEPTg Airport: By rapidly prepare From BeiEPTg South station to HangEPT west station
(1hour), then we can choose up you to manufacturing unit(40min).
B: Fly to ZheJiang Airport: By rapidly teach From ZheJiang XiHu (West Lake) Dis.hu (West Lake) Dis.ao station to HangEPT west
station(4.5 hrs), then we can select up you to manufacturing unit(40min).
2. Q: What should I supply if I want to custom-made EPT?
A: U want offer profile drawing, material, thickness, voltage and your EPT demands.
3. Q: What is the Warranty?
A: Within twelve mounts, all technicals are completely ready to serve you at any time.
4. Q: What can you do if the EPT damaged?
A: Our EPT’s guarantee period of time is twelve months, if the damaged elements are unable to mend, we will send
new components replace the broken elements totally free, but you require spend the specific EPT if right after guarantee period. we can negotiate to solve the difficulty, and we source the technical support for EPT existence of gear.
five. Q: If want technician to workshop to debug and educate, how to do?
A: We sent technician to your country to repair the EPT. Buyer must bear EPT incXiHu (West Lake) Dis.Hu (West Lake) Dis.: visa, round excursion ticket and appropriate lodging, also consumer need to pay the salary a hundred USD/day.